Yes. There is enough space below and around the panel arrays to enable grazing by small farm animals such as sheep.
There is low-level noise from inverters and transformers when the solar farm is producing energy. The locations of these are carefully selected to ensure that they are not close to houses. From the boundary of the solar farm, any noise will be less than background noise from traffic or wind.
Construction typically takes 12 months.
During construction there will be some increase in traffic movements in the areas but the process will be managed through a Construction Traffic Management Plan that will be agreed with the County Council to ensure that any disruption is kept to a minimum. Once operational, there will be 1 or 2 maintenance visits per month using light goods vehicles.
Solar panels are coated with an anti-reflective material to maximise light absorption. Although there still may be some glare from the panels, it is significantly less than that from standard glass. The arrays are designed and positioned on the site to minimise any potential visual impact on surrounding properties and the landscape.
The solar farm site will be enclosed by 2 metre high fencing and existing hedgerows where they are present. The site will be monitored by CCTV cameras directed into the site. Land outside of the site will not be monitored so privacy will not be compromised.
Solar farm developments incorporate biodiversity areas, landscape buffers and new and enhanced hedgerow planting that provide habitats for a variety of wildlife such as birds, insects and mammals. Panel arrays provide shade and shelter and vegetation within the site nurtures the soil and attracts insects.
Solar farms generally have an operational life of around 40 years. The planning permission usually requires that at the end of that period the arrays and other equipment is removed, and the site restored to its original condition and use in accordance with the detailed restoration/decommissioning plan. Solar panels can be recycled and valuable materials such as silicon and aluminium recovered.
The issue of whether the presence of a utility scale solar farm development has an affect on property values has been considered by planning authorities and An Bord Pleanála on many planning applications and they have been found that this is not the case